Project : Çamseki (Üvecik) Wind Energy Farm (20,8 MW)
Employer : Alize Enerji Elektrik Üretim A.Ş.
Job Description : Construction of 11 wind turbines,2230 mt stabilized road and peripheral facilities, 11 stabilized covered platform structure, construction of of substation areea and control building under the name of Camseki wind energy plant which shall be installed for Alize Enerji A.Ş. at the location of Çnakkale province, Ezine district, Üvecik village.
Location : Üvecik/ÇANAKKALE
Contract Date : 01.08.2008
Provisional Acceptance : 01.12.2008
Project Status : Finished

 

Specifications :
Business Within The Scope Of Commitment Businnes Item             :

 
·         Construction of 2230 mt. Stabilized road including all infrastructure and art works
·         15.000 m3 Excavation
·         5.000 m3 filling
·         4.900 m3 concrete
·         500 ton iron
·         4.500 ton Stabilized
·         50m3 Board
·         80.000 Liters diesel